The new project of Haimen Aeolon Wind Power Technology Development Co., Ltd. with an annual production capacity of 1000 sets of MW wind turbine blades has undergone soil and water conservation facility acceptance

Column:Corporate News Time:2023-06-15

According to the notice of the Ministry of Water Resources of the People's Republic of China on strengthening supervision during and after the event to standardize the independent acceptance of water and soil conservation facilities for production and construction projects (Shui Bao [2017] No. 365), the new project of Haimen Ailang Wind Power Technology Development Co., Ltd. with an annual production capacity of 1000 sets of MW wind turbine blades has undergone the acceptance of water and soil conservation facilities. The list of projects is now announced. Welcome the public to participate in the soil and water conservation work of construction projects.

1、 Publicity period: February 4, 2021~March 15, 2021

2、 During the publicity period, contact phone number: 18912898938

3、 Email: [email protected]

4、 Contact person: Mr. Jiang

5、 Basic information of the project

The new project with an annual output of 1000 MW wind power blades of Haimen Ailang Wind Power Technology Development Co., Ltd. is developed and constructed by Haimen Ailang Wind Power Technology Development Co., Ltd. The project area is located at No. 2198, Fazhan Avenue, Baochang Town, Haimen District, Nantong City, Jiangsu Province. The plot starts from Zonger River in the east, ends at Zongyi River in the west, starts from Nachao River in the north, and ends at Fazhan Avenue in the south. The coordinates of the center point of the project area are 121 ° 26 ′ 43.18 ″ E and 32 ° 6 ′ 32.49 ″ N. The total area of the project is 38.3274hm2, which is permanent land occupation. The project started in September 2018 and was completed in December 2019, with a total construction period of 16 months.

Construction unit: Haimen Ailang Wind Power Technology Development Co., Ltd

Construction site: Haimen District, Nantong City

6、 Acceptance Conclusion

The project has completed the construction of soil and water conservation facilities in accordance with the approved soil and water conservation plan, and the quality level of the soil and water conservation project is qualified. The water and soil conservation facilities of this project have effectively played their role in water and soil conservation, effectively controlled soil erosion within the scope of prevention and control responsibilities, achieved the approved prevention and control target values, implemented the responsibility of water and soil conservation operation management and maintenance, and met the acceptance conditions of water and soil conservation facilities. This project has passed the acceptance of soil and water conservation facilities.

7、 Main matters for soliciting public participation

The main purpose of this public announcement is to solicit ideas and suggestions on the independent acceptance of water and soil conservation in the project, understand the operation of the project on all parties in society, and the true attitudes and ideas of the public. By understanding the opinions of the public, we can effectively protect the interests of the affected population.


 

香港和宝典宝典资料大全76期海门艾郎风电科技发展有限公司年产1000套MW级风电叶片新建项目水土保持监测总结报告.pdf

香港和宝典宝典资料大全76期海门艾郎风电科技发展有限公司年产1000套MW级风电叶片新建项目水土保持设施验收报告.pdf

香港和宝典宝典资料大全76期海门艾郎风电科技发展有限公司年产1000套MW级风电叶片新建项目水土保持设施验收鉴定书.pdf